RIBA Plan of Work · Stage 3

    RIBA Stage 3: Spatial Coordination

    Stage 3 spatially coordinates the design before detailed information is produced. The architectural concept is tested and proven.

    Use this overview to plan your research. Verify current requirements and site-specific conditions against the relevant primary sources. Read our data sources, coverage and limits guide.

    Purpose

    Undertake Design Studies, Engineering Analysis and Cost Exercises to test the Architectural Concept and produce a spatially coordinated design.

    Core tasks

    • Spatially coordinated design
    • Engineering Analysis (structural grid, MEP zones, fire)
    • Updated Cost Plan
    • Planning Application typically submitted at end of Stage 3

    Deliverables

    • Spatially Coordinated Design
    • Updated Outline Specification
    • Updated Cost Plan
    • Planning Application

    Planning evidence pack

    Generate the daylight, sunlight, overshadowing, transport, and walkability evidence many LPAs request, in one click.

    Massing arbitration

    Test multiple massing options against rights of light, daylight, and overshadowing rules before locking the design.

    Questions

    When is planning submitted?

    Most projects submit at the end of Stage 3, once the design is spatially coordinated.

    Can Atlasly help with daylight and sunlight?

    Yes, automated VSC, NSL, APSH and overshadowing analysis are core Atlasly outputs.

    Explore site evidence for Stage 3

    Organise available site evidence and identify the checks and deliverables needed for your project stage.

    Open Atlas AI

    Review current plans and usage and source coverage for your project.