    RIBA Stage 4: Technical Design

    Stage 4 produces all the architectural and engineering information necessary for manufacture and construction.

    Use this overview to plan your research. Verify current requirements and site-specific conditions against the relevant primary sources. Read our data sources, coverage and limits guide.

    Purpose

    Develop architectural and engineering Technical Design to a level allowing manufacture and construction.

    Core tasks

    • Technical Design including all design team input
    • Specialist Subcontractor design (where appointed)
    • Building Regulations submission
    • Pre-construction Information

    Deliverables

    • Manufacturing Information
    • Construction Information
    • Building Regulations Application
    • Final Specification

    Compliance evidence

    Pull part L, part O overheating, and Future Homes Standard evidence into one consolidated pack for BCB submission.

    Questions

    Is Building Regulations submitted at Stage 4?

    Yes, Building Regulations submissions are typically made at Stage 4 when technical design is sufficiently advanced.

    Explore site evidence for Stage 4

    Organise available site evidence and identify the checks and deliverables needed for your project stage.

    Open Atlas AI

    Review current plans and usage and source coverage for your project.