Glossary
The AEC glossary for architects and planners
Plain-English definitions of 105+ terms across UK and global planning, feasibility, sustainability, design and data. Curated by Atlasly.
15-Minute City
planningNeighbourhood where daily needs are reachable in 15 minutes on foot.
Abnormals
feasibilitySite-specific costs above standard build rates.
Active Frontage
designGround floor uses that engage with the street.
Amenity Space
designPrivate or shared outdoor space for residents.
Ancient Woodland
planningWoodland continuously present since 1600 (England).
APN (Assessor's Parcel Number)
dataUS county reference for a parcel of land.
APSH (Annual Probable Sunlight Hours)
sustainabilityHours of sunlight a window receives over a year.
Article 4 Direction
planningLPA mechanism to remove permitted development rights.
BCIS
feasibilityBuilding Cost Information Service rates.
BER (Building Efficiency Ratio)
feasibilityNet usable area divided by gross internal area.
BIM Level 2
constructionUK government BIM mandate for public projects.
Biodiversity Units
sustainabilityUnit of measure under the statutory BNG metric.
Blue-Green Infrastructure
sustainabilityNetwork of water and vegetation features for resilience.
BNG (Biodiversity Net Gain)
sustainabilityUK requirement to leave biodiversity 10% better post-development.
BRE 209
sustainabilityBRE guidance on site layout for daylight and sunlight.
BREEAM
sustainabilityUK environmental assessment method for buildings.
BS EN 17037
sustainabilityEuropean daylight standard replacing BRE 209 metrics.
Build-to Line
planningRequired position of a building's front facade.
Building Envelope
designThe maximum permitted three-dimensional volume of a building.
Category A Fit-out
constructionOffice finished to a basic occupiable standard.
CIL (Community Infrastructure Levy)
feasibilityTariff charged per sqm on new floorspace to fund infrastructure.
Compulsory Purchase Order
planningStatutory power to acquire land for public benefit.
Conservation Area
planningArea of special architectural or historic interest.
Daylight Factor
sustainabilityRatio of internal to external illuminance under overcast sky.
Density (dwellings per hectare)
feasibilityNumber of dwellings per hectare of net residential land.
Density Range (London Plan)
planningLondon Plan policy D3 density approach.
Determination Period
planningStatutory time for an LPA to decide a planning application.
Development Appraisal
feasibilityCalculation of whether a development scheme makes enough profit, or can afford its land.
DfMA (Design for Manufacture and Assembly)
constructionDesigning for off-site fabrication.
DTM vs DSM
dataDTM is bare earth, DSM includes buildings and trees.
EIA (Environmental Impact Assessment)
planningFormal assessment of a major development's environmental effects.
Embodied Carbon
sustainabilityCarbon emissions from materials, construction, and end of life.
EPC (Energy Performance Certificate)
sustainabilityRating from A to G of a building's energy efficiency.
EPSG Code
dataIdentifier for a coordinate reference system.
FAR (Floor Area Ratio)
feasibilityRatio of total building floor area to plot area.
Footprint
designGround area occupied by a building.
FRA (Flood Risk Assessment)
planningAssessment of flood risk to and from a development.
GDV (Gross Development Value)
feasibilityTotal expected sale or letting value of a completed scheme.
GeoJSON
dataOpen standard for encoding geographic features.
GIA (Gross Internal Area)
feasibilityFloor area measured to the internal face of external walls.
Green Belt
planningDesignated open land around major UK cities.
Heritage Asset
planningBuilding, monument, site, place, area or landscape with heritage significance.
IFC (Industry Foundation Classes)
constructionOpen BIM data model standard.
IMD (Index of Multiple Deprivation)
dataEngland's primary deprivation measure.
LEED
sustainabilityUS Green Building Council rating system.
LETI (Low Energy Transformation Initiative)
sustainabilityVolunteer-led UK climate emergency design guide.
LIDAR
dataLight Detection and Ranging point cloud data.
LPA (Local Planning Authority)
planningCouncil body responsible for planning decisions in its area.
LSOA (Lower Super Output Area)
dataONS census geography of about 1,500 people.
LVIA (Landscape and Visual Impact Assessment)
planningMethod for assessing landscape and visual effects of development.
M4(2) and M4(3)
designEngland Building Reg standards for accessible homes.
Massing
designThe overall three-dimensional bulk of a building.
MEES (Minimum Energy Efficiency Standards)
sustainabilityUK regulation banning letting below minimum EPC ratings.
Modular Construction
constructionOff-site fabrication of building units.
NDVI (Normalized Difference Vegetation Index)
dataSatellite measure of green vegetation.
NIA (Net Internal Area)
feasibilityUsable internal area excluding columns, lifts, and toilets.
NPPF (National Planning Policy Framework)
planningEngland's primary planning policy document.
OSM (OpenStreetMap)
dataCrowdsourced open geographic database.
Outline Planning Application
planningApplication for principle of development with reserved matters.
Passivhaus
sustainabilityVoluntary fabric-first low-energy building standard.
Permeability
designNumber of route choices through an urban area.
Permitted Development
planningDevelopment you can do without applying for planning permission.
Phase 1 Desk Study
feasibilityInitial contaminated land assessment from records.
Planning Appeal
planningChallenge to a refusal heard by the Planning Inspectorate.
Plot Ratio
feasibilityUK term for FAR. Total floor area divided by plot area.
Policies Map
planningMap showing spatial application of local plan policies.
Pre-Application Advice
planningPaid LPA discussion before submitting a planning application.
Prior Approval
planningLighter-touch consent for certain permitted development.
Profit on Cost
feasibilityDeveloper's profit divided by total development cost.
Profit on GDV
feasibilityDeveloper's profit divided by gross development value.
PTAL (Public Transport Access Level)
planningLondon index of public transport accessibility, 0 to 6b.
Public Rights of Way
planningLegal rights to cross land on foot, horse or bike.
Remediation
constructionTreatment of contaminated land before development.
Reserved Matters
planningDetailed matters approved after outline consent.
Residential Amenity
planningQuality of living conditions for nearby residents.
RIBA Plan of Work
designEight-stage UK industry framework for building projects.
RIBA Stage 0
designStrategic Definition. Establish best means of delivering the client's needs.
RIBA Stage 2
designConcept Design. Architectural concept, outline structural and MEP.
Rights of Light
designLegal right to receive natural light through defined apertures.
RLV (Residual Land Value)
feasibilityValue a developer can pay for land after costs and profit.
Scoping Opinion
planningLPA's view on what an Environmental Impact Assessment must cover.
Section 106
planningLegal agreement for planning obligations attached to a UK consent.
Sequential Test
planningNPPF test that steers development to lowest flood risk areas.
Setback
planningRequired minimum distance between a building and a site boundary.
Shell and Core
constructionBase building delivered without internal fit-out.
Site Allocation
planningSite identified in a local plan for specific development.
Site Coverage
feasibilityFootprint of buildings as a percentage of plot area.
Space Syntax
designQuantitative analysis of spatial configuration.
STAC (SpatioTemporal Asset Catalog)
dataStandard for indexing earth observation data.
SuDS (Sustainable Drainage Systems)
sustainabilityDrainage that mimics natural processes.
SuDS Manual (CIRIA C753)
sustainabilityUK design standard for sustainable drainage.
Tall Building (London Plan)
planningBuilding substantially taller than its surroundings.
Tipping Point Analysis
feasibilitySensitivity test of viability to a single variable.
Title Number
dataUnique reference for a registered title at HM Land Registry.
Townscape Assessment
designVisual and character assessment of an area's built form.
TPO (Tree Preservation Order)
planningOrder protecting individual trees, groups, or woodland.
Transit-Oriented Development (TOD)
planningCompact, mixed-use development around high-frequency transit.
Urban Heat Island
sustainabilityTemperature uplift of urban areas vs surroundings.
Use Class Order
planningEngland's classification system for permitted land uses.
Validation Checklist
planningLPA's list of required documents to validate an application.
Viability Assessment
feasibilityTest that a scheme can be delivered while meeting policy.
VSC (Vertical Sky Component)
sustainabilityPercentage of skylight reaching a window from an obstructed sky.
Whole Life Carbon
sustainabilityTotal CO2e over a building's life.
Whole Life Cost
feasibilityTotal cost over a building's life including operation and demolition.
WKT (Well-Known Text)
dataText format for vector geometry.